↗
Quality Supervisor – Operations
Trigo Quality Solutions Canada, Windsor, Canada (On-site at Stellantis Windsor Assembly Plant)
2026-03 · 2026-10
• Provided technical support to inspection and production teams by interpreting AutoCAD drawings, engineering specifications, GD&T requirements, and approved engineering changes.
• Performed troubleshooting and root cause analysis of manufacturing discrepancies, collaborating with production, tooling, and engineering teams to implement corrective actions.
• Coordinated cross-functional communication and change implementation to ensure alignment between engineering specifications and manufacturing processes.
↗
Mechanical Engineer
University of Windsor – Industry Sponsored Projects, Windsor, Canada
2024-05 · 2026-02
• Utilized AutoCAD, SolidWorks, and Autodesk Inventor to develop and modify CAD models, mechanical components, assemblies, and engineering layouts based on project requirements.
• Performed CFD simulation and experimental data analysis using STAR-CCM+, MATLAB, and Python to investigate engineering performance, troubleshoot discrepancies, and support design optimization.
• Applied SQL to query, organize, and analyze structured datasets, supporting engineering data evaluation and technical reporting.
• Prepared and maintained engineering drawings, technical documentation, design revisions, and technical reports to communicate engineering requirements and project findings.
• Provided technical support to project stakeholders by addressing engineering queries, troubleshooting technical issues, and translating customer requirements into practical engineering solutions.
↗
Mechanical Design Engineer
Caparo Engineering India Limited, India (Automotive Steel Tube Manufacturing)
2019-07 · 2022-12
• Developed and modified CAD models, engineering drawings, and manufacturing equipment layouts using AutoCAD, SolidWorks, and Autodesk Inventor.
• Troubleshot manufacturing equipment and process issues using root cause analysis and engineering problem-solving methodologies, implementing improvements that increased tube mill productivity by 17%.
• Designed and implemented a forced-convection tube-drying system, evaluating system performance and optimizing operating parameters to reduce manufacturing scrap from 19 MT to 2.5 MT (87%).
• Supported engineering change implementation through equipment modifications, installation coordination, production trials, and performance validation.
• Maintained engineering drawings and technical documentation, communicating design modifications and coordinating with production, fabrication, and maintenance teams.