↗
Electrical Engineer
Norsat International Inc.
2026-04 · Present
• Collaborated with a Senior RF Electrical Engineer to analyze and improve the Ku-band BUC SSPA PCBA, reducing in-band gain variation from 3.0 dB to 1.5 dB through RF design revisions and filter optimization.
• Supported the redesign of a Ka-band BUC PCBA for increased integration and reduced product size by modifying schematics and PCB component layouts in Altium Designer. Updated product BOMs in Windchill following design revisions and coordinated with PCB manufacturers and component vendors to support fabrication and production.
↗
Production Engineer Team Lead
Norsat International Inc.
2025-08 · 2026-03
• Proficient in operating and managing RF test equipment of Keysight, Agilent, and Tektronix, including signal generators, signal analyzers (with noise source), vector network analyzers, power meters, power supplies, modems, and automated control via SCPI commands.
• Developed and currently maintain automated testing programs of instruments (GPIB Connections) using NI LabVIEW for RF products in C-Band, Ku-Band, and Ka-Band, such as Block Upconverters (BUCs) and Low Noise Block Downconverters (LNBs).
• Utilized Python scripts to process, digitize, and manage RF test data, streamlining data uploads into the ERP system (Dynamics 365 Business Central) and supporting the company’s digital transformation efforts.
• Supervised production engineers and technicians about the working process, testing and troubleshooting procedures. Explained technical principles to customer service representatives to help them comprehend the technical issues and solutions for customers.
↗
Production Engineer
Norsat International Inc.
2024-12 · 2025-08
• Skilled in troubleshooting and repairing PCBs of defective BUCs and LNBs with RS485/RS232/Ethernet communication (resoldering, replacing components, and performing circuit-level diagnostics using multimeters, signal generators, and signal analyzers) to ensure compliance with RF test specifications.
• Improved the RF products (BUC and LNB) testing process, revised and updated the corresponding documents in the PLM software (Teamcenter and Windchill).