Arun N.

Mechanical engineer with piping and static equipment experience

Toronto, ON

Open to opportunities

Open to
  • Full-time
Languages
English

About

• Extensive experience in Front End Engineering Design (FEED), Detailed Engineering and Construction Support for Static and Packaged Equipment, and Piping/ Pipelines. • Extensive experience in Asset Integrity and Repairs for Static Equipment and Piping/ Pipelines.

Skills

  • Valves: ASME, API Specification 6D for Pipeline and Piping Valves.
  • Proficient in Shell Design Engineering Practices (DEP) and ExxonMobil Global Engineering Practices (GP).
  • Proficient in pressure vessel/exchanger design software: Compress/PV Elite.
  • Well Versed in Piping Modelling E3D, Navisworks and Piping Stress Analysis CAESAR II software.
  • Proficient in ASME Sec. II (Materials), Sec V (NDE), and NACE MR0175 (Materials for Sour Service).

Experience

Project Leader-Piping

Onward Technologies Canada Inc., Mississauga, Ontario, Canada

2022-11 · 2025-04

Fuel Cell Energy SOFC (Solid Oxide Fuel Cell) Power Generation Location: Danbury, Connecticut, US, remote Mississauga, ON • Cost and design optimization of 250kW SOFC Units. Scope included Piping and Valve Materials Specification, Piping Layout, Piping Stress Analysis with Expansion Joints and Material Design Basis. Arun Nehru 2/5 Accelera-Division of Cummins Green Hydrogen Generation - (PEM Electrolysis) Location: Manufacturing-Fridley Minnesota, US, Engineering-Mississauga, Ontario, Canada • Led a team of 15 piping, valve and equipment engineers for development of piping layout, piping and valve material specifications, equipment design and selection, and 3-D Model for Hylyzer 5000 platform. All piping conformed to ASME B31.3 (Process) and ASME B31.12 (Hydrogen) requirements. • Resolved technical queries and provided technical guidance to team members, prepared schedules, assigned tasks, led mechanical/piping cross-functional discipline design and model reviews, and delivered design deliverables per milestones. This required co-ordination between Design and Drafting in Pune India, Piping & Equipment engineers in Belgium, Manufacturing in Fridley Minnesota, US and Platform Engineering in Mississauga, Canada.

Onshore-Principal Piping Engineer

DPE/ Conoco Philips, Dubai

2020-02 · 2022-04

Natural Gas Piping and Pipelines Location-Dubai • Approved engineering submissions and provided subject matter expert guidance to engineering consultants (Wood Group and Tebodin) for piping, pipeline and valve engineering drawings/documents for several multi-million-dollar projects such as new Block Valve Stations, Gas Control and Distribution Stations, Gas Dehydration Units, Pipeline Valve repairs and replacements, Gas Injection and Collection stations Valves, Piping and Gas Gathering Pipelines.

Principal Engineer - Piping

NES-Fircroft, Dubai, Wood Engineering Offices, Dubai

2018-01 · 2019-12

Shell PMC to Engineering and Asset Integrity Contractors Shell Gas Company subsidiary Royal Dutch Shell Liquefied Petroleum Gas (Propane-Butane) + Gasolene Facilities Location-Wood Engineering Offices, Dubai • Developed Plant Layout, 3-D Model and Piping Documents: Standard Piping Details, Piping Support Details, Piping Stress Analysis, Insulation/Painting and Hydro test for all new/existing plant piping for Process/Utility. Developed and approved Line Lists, Piping/Valve Material Specifications and Material Take Offs/Material Requisitions for procurement. • Developed Asset Integrity Plans, conducted Inspections, analyzed data per API 579/ASME FFS-1 and developed/approved Reports for Predictive Maintenance on gas assets (natural gas, propane, butane) and condensate/gasoline. Predicted remaining life for all pressurized and refrigerated liquefied gas assets- export tanks, vessels, heat exchangers, piping, pipelines and valves.

Mechanical Completions Engineer--Piping

Petroplan, Calgary, Alberta, Canada, Ft. McMurray, Alberta, Canada

2017-06 · 2017-12

Suncor Energy Fort Hills Oil Sands Project Location: Ft. McMurray, Alberta, Canada • Inspected piping and valves for mechanical completion/handover for Fort Hills Oil Sands Plant (300,000 bbl./day). Ensured all piping/ equipment were installed correctly per “Issued for Construction” Drawings.

Lead Mechanical Engineer-Static Equipment and Piping

NES-Fircroft, Dubai, SNC Lavalin Offices, Abu Dhabi

2015-07 · 2016-05

ExxonMobil Ltd. Gas Oil Separation Project Location: SNC Lavalin Offices, Abu Dhabi • Provided guidance to SNC Lavalin’s static/packaged equipment’s and piping engineers for Gas Oil Separation Projects for FEED/Detailed Engineering. • Developed Piping Documents: Piping and Valve Material Specifications, Standard Details, Supports, Insulation/Painting and Hydro test packages for Process/Utility and Fire Protection Lines. • Developed Plant Master Layout, and Guided development/provided tag resolutions for the 30%, 60% and 90% plant models. Approved all ISBL/OSBL piping routing with stress analysis including critical tie-ins. • Approved all Static/Packaged equipment engineering specifications, data sheets, calculations, material requisitions, Vendor bid clarifications/conditioning, technical bid evaluation, Vendor selection, specification/code exceptions/deviations, and equipment selection. Checked/modified/corrected and approved Vendor drawings/documents/calculations for fabrication of Pressure Vessels, Heat Exchangers, and Packaged Equipment

Construction Support Engineer-Static Equipment and Piping

Orion Project Services Ltd., Calgary, Alberta, Canada, Kearl Lake, Ft. McMurray, Alberta, Canada

2013-08 · 2015-03

IORVL-Imperial Oil Resources Ventures Ltd. (Joint Venture: ExxonMobil & Imperial Oil Canada) Kearl Oil Sands (Initial and Expansion) Projects, 240,000 bbl./day, $22 billion Location: Kearl Lake, Ft. McMurray, Alberta, Canada • Provided engineering support/guidance during startup/commissioning/construction of Pressure Vessels, Packed Columns, Heat Exchangers, Hydro-carbon Tanks, Primary/Tailings Separation Units, Froth Deaeration Units, Gas Fired Boilers, Water Treatment Systems, Flares etc. per specifications, manufacturer’s guidelines and good construction engineering practices. • Approved all specification deviations/and responded to Requests for Information for piping layout modifications/valve substitutions/supports, guides, anchors modifications and material substitutions related engineering changes. Inspected all hydrocarbon/utility lines for completion/handover. • Provided piping engineering support/guidance during construction/hydro-testing/commissioning of Kearl Interconnect Pipe Rack. This contains 12 lines from 2 inches to 52 inches in diameter. The material of construction was Carbon Steel/Stainless Steel and Fiber Glass Reinforced Plastic-FRP. Pipe rack is nearly 3000 meters long and is modular and multi-level in construction. Witnessed/approved hydro-testing of all lines. Inspected/approved during final walk down for entire pipe rack installation for mechanical completion/handover. Checked all mechanical dossiers for document completeness and accuracy for handover to Commissioning/Startup. • Rewrote/revised the Flange Management Instructions. Reviewed/approved Contractor’s pneumatic/ hydro test packs on Piping. Ensured all deep underground piping and grade elevations were accounted. Supplied bolt torque values for all piping class with lubricant and gasket selection. • Provided engineering support/guidance during construction/commissioning/startup and operation of atmospheric and pressurized storage tanks, including tank components and requirements such as product level and temperature measurement devices, gauges, vents etc., and tank safety and environmental criteria and requirements such as Nitrogen blanketing, leak detection, static electricity concerns, firefighting etc. Arun Nehru 4/5

Lead Mechanical Engineer–Static Equipment

Orion Project Services Ltd., Calgary, Alberta, Canada, Wood Engineering Offices, Oakville, Ontario/Calgary, Fort McMurray, Alberta

2009-05 · 2013-08

IORVL-Imperial Oil Resources Ventures Ltd. (Joint Venture: ExxonMobil Canada & Imperial Oil Canada) Kearl Oil Sands (Initial and Expansion) Projects 240,000 bbl./day, $22 billion Location: Wood Engineering Offices, Oakville, Ontario/Calgary, Fort McMurray, Alberta • Provided guidance to Wood Oakville/Calgary/Fort McMurray’s engineers for Kearl Oil Sands Project. Ensured all FEED/Detailed Engineering was in compliance with project specifications /industry codes, engineering contract/Vendor bid documents and good engineering practices. • Checked/modified/corrected and approved Static/Packaged equipment engineering specifications, equipment data sheets, design/calculations, material requisitions, Vendor bid clarifications/conditioning, technical bid evaluation, specification/code exceptions/deviations, Vendor and equipment selection. • Checked/modified/corrected and approved Vendor drawings/documents/calculations for fabrication of Pressure Vessels, Columns, Heat Exchangers, Packaged Equipment and Storage tanks. • Prepared/provided engineering responses to Technical Queries/Requests for Information, Specification Deviation Requests, and Non-Conformance Reports related to all static and packaged equipment to engineering contractor AMEC Foster Wheeler, Construction Management Contractor Fluor and Site Construction General Contractors. • Prepared/provided Technical Decision Records, Engineering Change Notices, Project Instructions, Equipment Inspection Reports including Factory Acceptance Tests related to all static and packaged equipment to engineering contractor, Construction Management Contractor and Site Construction General Contractors. • Pressure Vessels included Froth Settler Units (12); Steam/Condensate Recovery and Dump drums; Hydrocarbon Vapor Recovery drums (10), Natural Gas Knockout drums (2), Flare Knockout Drums (2), Boiler Deaerator/storage Vessels (2), Plant Air Receivers (2). • Packed Columns (Pressure Vessels) included: Solvent Recovery Units (2), Accumulators (36), Flash Columns (36). • Heat Exchangers included Hot Water shell and tube heat exchangers (6), Process Water shell and tube heaters (6), Hydrocarbon shell and tube heat exchangers (16), E-House VFD Fin-Fan Coolers (20). • Packaged Equipment included Gas fired Babcock & Wilcox Steam Boilers (8), Fuel Gas heaters (2), Deionized/Potable Water Treatment Systems (2), Compressed Air Systems (8), L.P.Flares (2), Primary Separation Unit (1), Tailings Separation Units (4). • Storage tanks included 9 API 650 Fixed Roof hydrocarbon tanks. Tanks were: Dilbit Product (46m Dia, 17m height), Diluent (40m Dia, 14m height), Froth Storage (35m Dia, height 25m), Solvent (25m Dia, 17 m height) and bulk diesel (12m Dia, 15m high). Developed Project Instructions for Preservation Procedures for Static and Packaged equipment and ensured compliance by inclusion in Engineering Specifications/Material Requisitions/Site Engineering Change Notices. Arun Nehru 5/5

Senior Static Mechanical Engineer

Shaw Energy and Chemicals (Canada)-Engineering Consultants, Toronto, ON, Canada

2006-02 · 2009-04

Yanbu National Petrochemical Co. (YANSAB), a div. of SABIC (Saudi Basic Industries Corp.) 400 KTA HDPE Plant, Yanbu, Saudi Arabia Location – Shaw Energy Offices, Toronto, ON, Canada • Prepared specifications, data sheets, sketches and calculations, requisitions, bid evaluations. Selected Vendor/equipment and approved Vendor documents for fabrication: Distillation and Scrubber Columns and internals (trays and packing) Twenty-one (21) carbon steel and four (4) stainless steel pressure vessels Hexane - Butane Adsorption System (Dehydration) including five (5) packed columns Four above ground API 650 hydrocarbon storage tanks and eleven storage silos. Various Organizations Mechanical Engineer-Piping, Pressure Vessels, Heat Exchangers, Packaged Equipment and Tanks GMCL, Oshawa, Ontario, Canada (May’00-Jan ‘06) Shaw Energy & Chemicals (Stone and Webster), Toronto, Ontario, Canada (Jan'99-April’00) Klohn Crippen Engineering Consultants, Toronto, Ontario, Canada (Apr’98-Dec.’98) Cargill, Paris, Illinois (U.S.A.) (Dec ‘96-Jan ‘98) Marlow Design Ltd., Markham, Ontario, Canada (May’95-Aug’96) 1432560760095238448579707000238448579707000CASCO Inc., Cardinal, Ontario, Canada (Jun ‘93- Oct’94)

Education

B. Eng. (Mech.)

Aligarh University, India

M. Eng. (Mech.)

McGill University, Montreal, Canada

P. Eng.-Licensed Professional Engineer

Ontario, Canada