Waseem Y.

Field Operator | SRU • TGTU • ARU • CDU/VDU | Commissioning

Toronto, ON

Open to opportunities

Open to
  • Full-time
Workplace
On-site
Experience
10 years
Languages
Urdu: Native · English: Fluent (professional working proficiency) · Arabic: Basic (operational, Iraq environment) · Urdu · English · Arabic

About

Process Field Operator with 10+ years of hands-on refinery experience in sour gas handling, acid gas treatment and sulfur recovery. Field experience across SRU/TGTU (3-stage Claus), Amine Regeneration (ARU), Sour Water Stripping (SWS), Crude Distillation (CDU) and Vacuum Distillation (VDU), including greenfield commissioning of a 360 TPD SRU block. Achieved 99.9% sulfur recovery, meeting emission specifications under varying feed gas compositions. Handled major plant upsets (total blackout, cooling water failure, instrument air loss) and restored stable operation, with zero LTI across 10+ years.

Skills

  • Units: SRU (3-Stage Claus), TGTU, ARU, SWS, CDU, VDU
  • Safety Systems: PTW, LOTO, Gas Testing (H2S / LEL / O2), Confined Space Entry, PSM, HAZOP/PHA, API Standards
  • Standards: API Refinery Standards, HSE Compliance, Environmental Emission Standards (99.9% Sulfur Recovery)
  • Communication
  • Teamwork
  • Problem solving
  • Time management
  • Production Scheduling
  • Operational Excellence
  • Process Optimization
  • Troubleshooting
  • Process

Experience

Process Field Operator – SRU Block

Karbala Refinery Project (KRP), Karbala, Iraq

2022-08 · Present

Units: SRU + TGTU (360 TPD) | ARU (634 Nm /hr) | SWS (126 Nm /hr) • Operated and monitored ARU, SWS, SRU and TGTU within design parameters and API operating standards for safe, stable plant performance. • Achieved 99.9% sulfur recovery on the 3-stage Claus SRU with TGTU across varying feed gas compositions, meeting emission specifications for 3+ consecutive years. • Managed liquid sulfur handling, sulfur pit operations and degassing, and sulfur transfer pump coordination on a 360 TPD system, working with DCS operators and cross-functional teams. • Executed start-up, planned shutdown and Emergency Shutdown (ESD) of the SRU block per approved SOPs and HSE guidelines. • Monitored unit KPIs including H2S conversion, amine circulation, sour water feed flows and incinerator temperature profiles. • Responded to high-severity upsets (blackout recovery, cooling water failure, steam fluctuations, instrument air loss) and restored stable operation with no LTI. • Participated in HAZOP/PHA reviews to identify and mitigate SRU block risks. • Maintained shift handover logs and operational records in line with PSM requirements. Pre-Commissioning & Commissioning • Executed greenfield commissioning of the SRU block (SRU 360 TPD, TGTU, ARU, SWS) from P&ID verification and line checking through first product dispatch, with zero LTI. • Performed hydrostatic testing, flushing, steam blowing and leak testing; supported catalyst loading/unloading and reactor preparation per vendor and API procedures. • Conducted refractory dry-out of the thermal reactor and incinerator per approved vendor and API procedures.

Field Operator – CDU / VDU

National Refinery Limited (NRL), Karachi, Pakistan

2016-04 · 2022-08

• Operated CDU and VDU for 6+ years (furnaces, vacuum systems, pumps, compressors, columns), maintaining on-spec product quality across multiple crude grades including Arabian Light and Heavy. • Managed desalter interface level and wash water injection ratios to sustain salt removal and reduce overhead corrosion risk. • Resolved recurring issues including heat exchanger fouling, vacuum column stripper instability and ejector performance degradation, using RCA to restore stable vacuum levels. • Carried out equipment isolation, line-up and maintenance preparation under PTW and LOTO, with zero safety incidents over 6 years. • Contributed to shift-level adjustments for vacuum column pressure stability, reduced atmospheric residue carryover and better on-stream reliability. CDU/VDU Revamp – Commissioning (with Hualu Engineering) • Supported commissioning of the pre-flash column, VDU heater and 5-stage vacuum ejector system; raised and tracked A/B/C punch list items through to plant handover. • Assisted with vacuum leak testing, system integrity checks and plant start-up on Arabian Light crude per API standards.

Education

DAE – Chemical Technology (Grade: 77%)

Sadiqabad Polytechnic Institute, Pakistan

2011 · 2014

Certificates & licences

  • Normal Operating Procedures (NOP) Certification – Karbala Refinery Project
  • H2S Safety & Gas Testing (H2S, LEL, O2)
  • Fire Fighting & Emergency Response
  • Confined Space Entry & Rescue
  • LOTO & PTW Authorization
  • HAZOP / PHA Participation – Karbala Refinery Project
Get in touch
My Chatham-Kent

How can we help?