Leonardo M.
HEAVY EQUIPMENT OPERATOR | LEAD SUPERVISOR — UNDERGROUND CONSTRUCTION
King City, ON
Open to opportunities
- Job type
- Full-time
- Workplace
- On-site
- Experience
- 45 years
About
Heavy equipment operator and lead supervisor with over 45 years in construction across the GTA and surrounding areas. Specializes in sewer and watermain, storm systems, roads, footings, and all aspects of underground work — with a proven record of projects completed on time, on budget, and to a high standard, including landmark builds delivered ahead of schedule. Licence Ontario Class G PROJECT HIGHLIGHTS BMO Field Soccer Stadium, Toronto (2007) — PCL. Design-build project for the 159,693 sq. ft. stadium field. Existing underground utility records dated to 1945, so a plan was developed to re-route new utilities into the existing system. Oversaw a tight schedule and supervised a skilled team, completing the project ahead of schedule while keeping costs efficient for the general contractor and owner. CNE, Toronto — Realignment of Princess Boulevard (2006) — PCL. Realigned the existing Princess Boulevard in conjunction with, and to accommodate, the new BMO stadium. Terminal 3, Pearson International Airport, Toronto (2004) — PCL / AECON. Participated in two essential stages of the GTAA Airport Development Program: installation of underground services for the new buildings, and construction of the new “hammer heads.” RBC Dexia Building and Woodbine Racetrack. Excavated for utilities — water, storm, sewer, and electrical — three storeys below ground level in shale rock in a confined area at the Dexia Building. At Woodbine Racetrack, successfully installed watermains to the horse barns.
Skills
- Heavy equipment operation — all site machines
- Crew leadership and multi-trade supervision
- Sewer, watermain and storm system installation
- Site safety and regulatory compliance
- Road construction and reconstruction
- Liaison — city, owners, municipal inspectors
- Underground utilities and footings
- Helical pile installation (Almita authorized)
- Heavy equipment operation
- Preventive Maintenance
Experience
Heavy Equipment Operator / Lead
Remo General Contracting Ltd., Brampton, ON
2008 · Present
Operate all heavy equipment on site and lead day-to-day field operations. • Manage and supervise multiple trades, primarily on school construction projects in the Peel Region and the City of Brampton. • Serve as the liaison between the city, owners, and site crews.
Lead / Supervisor — Underground Utilities
Valentine Underground Ltd., Toronto, ON
2000 · 2007
Led installation of underground utilities and reconstruction of roads. • Supervised crews and handled all communications between the city and municipal inspectors.
Site Supervisor
W.S. Morgan, Toronto / Barrie, ON
Provided site supervision and acted as liaison between the city and owners.
Education
Ontario Secondary School Diploma
Mayfield Secondary School
Selected work
RBC Dexia Building and Woodbine Racetrack. Excavated for utilities — water, storm, sewer, and electrical — three storeys below ground level in shale rock in a confined area at the Dexia Building. At W
BMO Field Soccer Stadium, Toronto (2007) — PCL. Design-build project for the 159,693 sq. ft. stadium field. Existing underground utility records dated to 1945, so a plan was developed to re-route new
CNE, Toronto — Realignment of Princess Boulevard (2006) — PCL. Realigned the existing Princess Boulevard in conjunction with, and to accommodate, the new BMO stadium.
Terminal 3, Pearson International Airport, Toronto (2004) — PCL / AECON. Participated in two essential stages of the GTAA Airport Development Program: installation of underground services for the new
Certificates & licences
- Working at Heights — WAH-56791 (Antonio Cruz) Refreshed Aug 18, 2024
- Elevated Work Platform (All2BSafe) Aug 18, 2024
- Industrial Forklift — Class 5 (All2BSafe) Aug 18, 2024
- All Terrain Forklift — Class 7 (All2BSafe) Aug 18, 2024
- Propane Safe Handling CH-02 — Construction Heaters (TSSA) Exp. Aug 18, 2027
- Helical Pile Installation — Authorized Installer (Almita Piling, CCMC #13691-R) Sep 11, 2020
- Confined Space Awareness (GM Group) Nov 24, 2016
- P.E.W.P. — Scissor Lifts and Boom Platforms (GM Group) Nov 24, 2016
- WHMIS current — completed Jan 23, 2026, valid to Jan 23, 2027. Full 4SafeCom training record (32 courses): page 2.
- AODA
- Elevated Work Platforms
- WHMIS
- WVHE — Workplace Violence & Harassment Education
- Propane Safety
- Power Hand Tools
- Office Ergonomics
- MMH & MSD — Manual Material Handling
- Ladder Safety
- Heat Stress
- Asbestos Awareness
- Spill Response
- Defensive Driving
- Confined Space Awareness
- Personal Protective Equipment
- Electrical Safety
- WHSA — Worker Health & Safety Awareness
- Fire Extinguisher Awareness
- Elevated Work Platform
- Propane Heating Systems
- Fork Lift Truck Safety
- Working At Heights
- Traffic Control Safety
- Worker H&S Awareness
- P.E.W.P. — SJ8841, SJ7127, J111 4632, G-85 (500 lbs capacity)
- P.E.W.P. — JLG1932E2, JCB Loadall, Z135, Z80
- P.E.W.P. — Genie 45 Not shown —
- Class G Driver's Licence · Ontario Ministry of Transportation