Environmental Health & Safety Lead – Solar PV & BESS
NEOM Green Hydrogen Company (NGHC)., NEOM, KSA
2023-08 · 2025-04
Project: Construction of Shigry Solar PV Power Plant 2.9GWp DC, BESS (Battery Energy Storage system) 400 MWh.
Client: NGHC | EPC Contractor: Air Products | Subcontractor: Larsen & Tourbo
Key Contributions:
• Led and oversaw all EHS activities across the project, ensuring full compliance with established procedures, contractual obligations, and regulatory requirements.
• Conducted joint EHS inspections, awareness sessions, & management walkthroughs to identify and mitigate potential hazards.
• Oversaw HAZID, and constructability reviews to proactively mitigate risks during execution phases.
• Monitored & enforced PTW compliance for high-risk activities, including energized work & OHTL.
• Oversaw and participated in incident investigations and RCA, ensuring timely corrective actions
• Led EHS meetings with the EPC contractor and key stakeholders and tracked action items.
• Ensured workforce health, safety, and welfare compliance, including camp inspections.
• Led internal and external HSE audits to drive continuous improvement in safety performance
• Monitored & enforced IFC-compliant workforce welfare standards, including camp inspections, ethical labor practices, & safety culture initiatives.
• Fostered worker engagement and empowerment by facilitating open communication on safety concerns and suggestions.
• Ensured timely submission of EHS performance reports, KPIs, and trend analysis to management.
• Ensured safe execution of pre-commissioning and commissioning activities, including LOTO, energization, and system integration.
↗
Deputy Health, Safety, Security & Environment Manager
Shanghai Electric Group Co. Ltd., Dubai, UAE
2019-02 · 2023-02
Project: Mohammed Bin Rashid Al Maktoum Solar Park, Phase IV, 700Mw CSP + 250mV PV Hybrid
Client: ACWA Power, NOOR ENERGY 1/ DEWA | EPC Contractor: Shanghai Electric Group
Key Contributions:
• Conducted inspections and audits of the site to evaluate existing processes and enforce compliance with health, safety, and environment (HSE) guidelines.
• Improve efficiency and reduce downtime at the site through HSE assessments, regular review of HSE manuals including commissioning, and monitoring of plans, RAMS, and emergency procedures.
• Led social and environmental audits to ensure compliance with IFC’s Environmental & Social Sustainability
Framework.
• Conducted incident investigations & RCA, implementing corrective & preventive actions (CAPA) that reduced site incidents.
• Conducted fire risk assessments and emergency response drills to improve site preparedness
• Advised stakeholders on setting up/and driving improvements in the Project HSE Management System for project employees,
• Prepared technical reports, including Walkthrough Reports, Audits, HSE Alerts, detailing risk assessments, investigations, and safety related write-ups,
• Maintained a safety culture by developing and delivering HSE training sessions.
↗
Project HSE Engineer
Ghantoot Transport & General Contracting Est., Dubai, UAE
2018-11 · 2019-01
Project: Construction of Nad Al Sheba Substation, 132kV BSP
Client: Dubai Electricity and Water Authority (DEWA) | Consultant: Energoprojekt ENTEL | Main Contractor: GE Power
Key Contributions:
• Developed and enforced EHS programs and risk control measures.
• Defined site safety objectives, procedures/programs, monitored plans and results through performance metrics, and presented them for management reviews
• Conducted safety audits, inspections, and risk assessments, ensuring compliance with DEWA safety standards.
• Prepared Emergency drills scenarios & conducted mock drills to improve preparedness in emergency situations.
• Performed risk assessments to identify risks and develop effective methods for risk control and management
• Improved safety record and reduced risks by reviewing gaps, and initiating gap closure plans for enhancing the safety management system
↗
Project HSE Lead
Bauer International FZE, Dubai, UAE
2017-02 · 2018-10
Project: Expo Route 2020 Metro Rail, D-474 & D-472
Client: RTA, Dubai | Consultant: Parsons-Systra |Main Contractor: Expolink JV (Alstom, ACCIONA, Gülermak)
Key Contributions:
• Directed Safety Observations and Conversations (SOCs), and HSE inspections/audits.
• Developed and implemented HSE standards and programs based on periodic reviews of contractors' HSE plans
• Performed hazard analysis pertaining to the disposal of grout-trapped contaminants
• Led near-miss hazard investigations, toolbox meetings, HSE meetings, construction meetings, and devised corrective actions to prevent reoccurrences
• Audited subcontractor equipment certificates for validity and issued permits
• Prepared the site for mobilization/demobilization of equipment
• Designed and delivered HSE training programs, improving workforce safety awareness.
↗
Site HSE Supervisor
Alfanar Co., Riyadh, Saudi Arabia
2015-04 · 2016-06
Project: Construction of Tabarjal Substation 380/132/33kV BSP
Client: Saudi Electricity Company (SEC) | Consultant: SEC 5-Star Safety
Key Contributions:
• Inspected underground and overground activities (deep excavation, scaffolding, erections of GIS/transformers, cable laying/pulling/termination), and prepared plans for seamless execution under the permit-to-work system.
• Conducted regular audits of work permits, scaffolding, fire extinguishers and tools, etc.
• Embedded a safety culture by delivering comprehensive training sessions for employees, including HSE
Technicians and Officers, on work practices and equipment safety.
• Compiled and drafted monthly safety statistics reports/inspection reports based on accident investigations and developed zero-harm plans.
↗
Senior Safety Officer
Amana Contracting & Steel Buildings, Doha, Qatar
2013-05 · 2014-11
Projects: Al
Wakrah Stadium J-119 & Al Nuaim Healthcare Center J-118
↗
Safety Officer
Mithaq Enterprises, Islamabad, Pakistan
2008-04 · 2013-01
Project: King Abdullah's Relief
Campaign for Pakistani People (KARCPP)
↗
Assistant Safety Officer
Industrial Clothing Private Limited, Karachi, Pakistan
2006-09 · 2008-02