Founder & Technical Office Manager
A.H. Consultancy (AHC), Cairo, Egypt
2022-09 · 2025-12
• Founded and managed an independent engineering technical office; reviewed and approved design drawings, calculation sheets, and structural models for residential, mixed-use, and high-rise developments (Al Waha Village, SONDOS Area, Laloah Tower).
• Led design and site supervision of the Al-Lulu Building in Jeddah, KSA (Mar–Jul 2024), a mixed-use residential, commercial, and hotel high-rise.
↗
Head of Structures
Attaby Consultancy, Cairo, Egypt
2022-02 · 2022-09
• Coordinated delivery of The ARK Development zone as Deputy Project Manager on the 400,000 m² administrative development.
• Reviewed and approved designs, calculation sheets, and structural models for the Hayat Karima water and sewage treatment plants (Qena and Sohag), ALalameen, and Haykestep (5th Settlement); contributed to the Damietta mixed-use building design.
↗
Head of Structures
Husain Aljaffry Consulting Office, Makkah, KSA
2021-03 · 2022-01
• Led structural design, design review, site supervision, and coordination meetings for residential projects (3 villas and 2 house buildings).
↗
Project Manager
Rowad Al Faisal Contracting Co., Al Baha, KSA
2020-11 · 2021-03
• Managed the King Saud National Airport rehabilitation for international operation, including the firefighting building, exhibition hall, electrical building, and water tanks.
• Controlled scope, schedule, budget, and quality; tracked project costs against budget, led hiring and mentoring of the engineering team, and developed the project quality plan.
↗
Risk Manager / Senior Civil Engineer
Dar Al-Handasah, Makkah, KSA (
2008-09 · 2020-12
• Directed risk management as Dar Al-Handasah's Risk Manager (2018–2020) on the King Abdullah Mataf Extension Project (KAME), a 3-stage mega program within the Holy Mosque inner-ring enlargement (CA$ 16B+); developed and maintained the risk management plan and risk register across all phases, identifying risks and supporting mitigation and contingency planning. Coached colleagues, the program's cost consultant (AECOM Arabia), and contractor teams on risk identification and assessment.
• Reviewed contract documents and claims from main contractor Saudi Binladin Group on KAME (2017–2020): entitlement, notices, records, and cost/time impacts.
• Inspected and approved concrete and structural steel works against ITPs, ACI 318-14 and ACI repair guidance, AISC, ASTM, and the Saudi Building Code (SBC) under an ISO 9001 quality system, enforced hold and witness points, and witnessed and approved field and laboratory tests, including concrete slump, cube/cylinder compressive strength and core tests, soil compaction, pile load and rebar tests, and weld inspection with ultrasonic testing (UT) of structural steel connections; issued and closed Non-Conformance Reports (NCRs) and reviewed shop drawings against the design.
• Supervised the expansion of Hajj camps in Arafat, a traffic diversion road, and safety barriers at the Mina incident site (2015), resolving pedestrian and vehicle traffic overlap.
• Inspected civil works on facilities associated with the Al-Mashaer Al-Mugaddassah Metro (CA$ 2.5B), including a pedestrian bridge at Muzdalifah Station 1; reported weekly and monthly to the Ministry of Municipal and Rural Affairs.
• Supervised the Aljamarat Bridge enlargement (two main bridges, CA$ 40M), the Muzdalifa storm water network with two retention dams of 70,000 m³ and 140,000 m³ (CA$ 14M), and a pedestrian tunnel and bridges; approved shop and as-built drawings.
• Oversaw main contractor Saudi Binladin Group as supervision consultant on the King Abdulaziz Endowment (Waqf) mixed-use high-rise (six 60-floor residential towers, an 80-floor hotel, mall, and 1,250-car parking).
• Supervised structural steel and concrete works, concrete repair, and cementitious waterproofing of water treatment tanks on the Makkah Clock Tower.
• Received a letter of appreciation from the Haram Expansion Technical Committee (Umm Al-Qura University) for removing the temporary Mataf bridge in record time (2016).
↗
Technical Office Manager
Saudi Constructioneers Ltd. (SAUDICO), Makkah, KSA
2008-01 · 2008-09
• Directed the technical office for the Jabal Al-Kaabah (Anjum Tower) project (CA$ 40M; 400-room hotel and 26-floor residential tower): bar bending schedules, shop drawing and submittal review, project schedule, and resolution of site issues.
↗
Structural Engineer → Owner's Rep. → Project Manager
Al Zayed Consulting Office, Riyadh, KSA
2004-06 · 2008-01
• Seconded as Project Manager to Mohammad Abdul Rahman Al-Sudais (2007–2008): delivered the Al-Othaim Mall across two steel-frame sites 20 km apart, managing design review, documentation, site inspection, and schedule control.
• Seconded as Owner's Representative to Bakarman Group (2006): reviewed contractor submittals and supervised reinforcement and concrete works on the Raseel Center (CA$ 15M), a 9-floor office building with a precast parking annex.
• Seconded as Owner's Representative to Al-Qassim Real Estate Development (2005–2006) on the Al-Safwa development (CA$ 40M, 2.7M m²): coordinated contractors and designers, led authority approvals, and managed sewer, water, lighting, electrical, and telecom networks.
• Structural Design Engineer at the Riyadh office (2004–2005): designed projects in Tabuk, Duba, Al-Wajh, Beer bin Hermas, and Halat Ammar using AutoCAD and SAP2000.
↗
Early Career
Cairo, Egypt
2000 · 2004
• Junior Structural Designer, Prof. Dr. Amr Ezzat Salama Consulting Office (2003–2004): structural design, AutoCAD drawings, and SAP2000 models for projects including the National Museum of Egyptian Civilization.
• Technical Office Engineer, Top For Contracting Co. (2002–2003): shop drawings and quantity take-offs for reinforced concrete works, including the VACSERA cooling building.
• Engineering Trainee, Prof. Dr. Saafan Abdulgawwad Consulting Office (2000): rehabilitation of the historic Assay and Weights Authority building in El-Hussein, Historic Cairo.